Project Name:

Churchill Place, Mill Hill, London

Slate Supplied:

Specified By:

Architect:

Main Contractor:

Taylor Wimpey

Roofing Contractor:

JSJ Roofing

Project Overview:

SIGA 39 slates were chosen for a Taylor Wimpey new build property development on Mill Hill, London. Churchill Place has been built in close proximity to Mill Hill’s numerous shops, bars and restaurants. This exclusive development, comprising just 34 high-quality houses and apartments, has been completed to a high standard specification.

Taylor Wimpey’s in-house design team specifically requested a premier slate with a superior finish which would be in keeping with the aesthetics of a high-end residential development. SIGA 39 is an outstandingly successful first selection slate from the Excellence range which is flat, uniform and of consistent thickness.

In Detail

With an aesthetically pleasing blue grey textured finish and excellent performance characteristics, SIGA 39 is the obvious choice for new build and refurbishment projects as it complies with NHBC
requirements. It is well suited to visually complement existing properties in Mill Hill.

A popular choice with roofing contractors, SIGA 39 requires minimal sorting on site, enabling fast paced installation. Both developer and contractor were satisfied that SIGA 39 would provide a reliable, long-lasting roof with the added reassurance of SIG’s own 75-year warranty.

Appointed roofing contractors to the scheme were JSJ Roofing who are established roofing contractors for national house builders, Taylor Wimpey and many other of the UK’s leading developers. Operating in Hertfordshire, Bedfordshire, Cambridgeshire and North London, they offer an expert roofing service for the supply and fixing of roof coverings including tiling, slating, single ply flat roofing and all associated lead works.

SIGA 39 is an outstandingly successful first selection slate from the Excellence range that is flat, uniform and of consistent 5.5m thickness.

“Based on previous projects, Both Taylor Wimpey and JSJ Roofing place their trust in SIGA natural slate for its supply chain, grading processes and warranties. The Churchill Place development was supplied though SIG’s St Ives branch and the project progressed smoothly. The North London region of Taylor Wimpey specifies SIGA slate on numerous projects.”
Jon Little, Joint Managing Director, JSJ Roofing